Hydroelectric Power Plants

In hydroelectric power plant SCADA system; water level, temperature values, control of turbines, pressure and flow control are instantly monitored, reported and recorded in the database. PLC system runs with redundancy. System configuration is designed accordingly. Control of any information related to Intake gate, water level, oil level, temperature, pressure and speed is provided in automation of hydroelectric power plants. Turbines are instantly monitored and controlled. Synchronization of generators is provided. HV, MV and LV power distribution and command systems are controlled. From SCADA and mimic control desk, monitoring and control operations are carried out. Protection relays, regulators and the energy analyzers are monitored. Plant emergency stop scenarios are applied. On / off information is received for all valves and switches. Warning, synchronization and fault information is transmitted.